  • Acquisition Cost: £2,100,000
  • Build out cost to TMS: £35,000,000
  • GDV: £50,000,000
  • Renewable Energy Type: Gas Peaking Plant

Project Description

The Pencoed Project is a 40MW Peaking gas generation project. From a technical perspective it is largely a predesigned proposal consisting of the following principal components:

  • 20 x 2MW gas generators
  • 2 x switch gear container
  • 2 x brick switchroom 5.5m (l) x 4.1m (w) x 2.4m (h)
  • 10 x transformers
  • Access hardstanding